1 00:00:18,859 --> 00:00:16,000 [Music] 2 00:00:20,840 --> 00:00:18,869 Saturn five quarterly film report number 3 00:00:23,410 --> 00:00:20,850 sixteen covers progress during the 4 00:00:29,760 --> 00:00:23,420 period September October and November at 5 00:00:34,930 --> 00:00:32,890 at launch complex 39 of the Kennedy 6 00:00:37,450 --> 00:00:34,940 Space Center Assembly of the first 7 00:00:40,450 --> 00:00:37,460 Saturn 5 flight vehicle scheduled for 8 00:00:42,850 --> 00:00:40,460 launch next year began on October 27th 9 00:00:47,530 --> 00:00:42,860 with direction of the first stage in LC 10 00:00:49,869 --> 00:00:47,540 39 s vertical assembly building a second 11 00:00:51,820 --> 00:00:49,879 stage simulator or spacer stage was 12 00:00:55,000 --> 00:00:51,830 stacked atop the first stage October 13 00:00:58,780 --> 00:00:55,010 31st the actual second stage is due to 14 00:01:00,670 --> 00:00:58,790 arrive at KSC in January 1967 from 15 00:01:02,710 --> 00:01:00,680 Marshalls Mississippi test facility 16 00:01:05,469 --> 00:01:02,720 after completion of acceptance firing 17 00:01:07,450 --> 00:01:05,479 there the stage will then replace the 18 00:01:09,190 --> 00:01:07,460 simulator which meanwhile will have 19 00:01:13,630 --> 00:01:09,200 provided for checkout of interface 20 00:01:15,730 --> 00:01:13,640 capabilities with other stages the third 21 00:01:18,160 --> 00:01:15,740 stage for the first Saturn 5 flight 22 00:01:20,620 --> 00:01:18,170 vehicle was erected on November 1st and 23 00:01:22,830 --> 00:01:20,630 the instrument unit was added the 24 00:01:25,359 --> 00:01:22,840 following day the Apollo spacecraft 25 00:01:27,850 --> 00:01:25,369 completing the vehicle will be attached 26 00:01:37,779 --> 00:01:27,860 after the actual second stage replaces 27 00:01:40,149 --> 00:01:37,789 the second stage simulator also at LC 39 28 00:01:42,069 --> 00:01:40,159 the mission of the Saturn 5 facility's 29 00:01:43,870 --> 00:01:42,079 checkout vehicle in checking out pair 30 00:01:45,849 --> 00:01:43,880 days launch facilities and ground 31 00:01:48,819 --> 00:01:45,859 support equipment was completed during 32 00:01:53,410 --> 00:01:48,829 this report period check-out operations 33 00:01:55,419 --> 00:01:53,420 had begun last June following repair 34 00:01:57,940 --> 00:01:55,429 this quarter of a rupture which occurred 35 00:02:01,569 --> 00:01:57,950 in August in pair days liquid oxygen 36 00:02:03,489 --> 00:02:01,579 feed line a series of tanking tests of 37 00:02:05,260 --> 00:02:03,499 all three stages of the facility's 38 00:02:06,700 --> 00:02:05,270 checkout vehicle was successfully 39 00:02:09,609 --> 00:02:06,710 completed in mid-october 40 00:02:12,309 --> 00:02:09,619 during the final tanking liquid oxygen 41 00:02:14,380 --> 00:02:12,319 was pumped into the first stage and lox 42 00:02:18,580 --> 00:02:14,390 and liquid hydrogen filled the second 43 00:02:20,800 --> 00:02:18,590 and third stages upon completion of 44 00:02:23,080 --> 00:02:20,810 tanking tests the facility's checkout 45 00:02:25,809 --> 00:02:23,090 vehicle mounted on mobile launcher one 46 00:02:30,610 --> 00:02:25,819 was transferred back into the VAB on 47 00:02:32,530 --> 00:02:30,620 October 14th to be de erected the Apollo 48 00:02:35,440 --> 00:02:32,540 spacecraft and instrument unit were 49 00:02:37,480 --> 00:02:35,450 directed on October 15th the Apollo 50 00:02:40,000 --> 00:02:37,490 command and service modules were shipped 51 00:02:42,370 --> 00:02:40,010 to MSFC for use in the dynamic test 52 00:02:45,070 --> 00:02:42,380 program the IU were 53 00:02:48,880 --> 00:02:45,080 at KSC for use in pet be checkout 54 00:02:51,340 --> 00:02:48,890 scheduled to begin in July the third 55 00:02:52,630 --> 00:02:51,350 stage and second stage were directed on 56 00:02:54,970 --> 00:02:52,640 October 16th 57 00:02:57,400 --> 00:02:54,980 the third stage will stay for a pad be 58 00:03:00,100 --> 00:02:57,410 checkout the second stage was modified 59 00:03:02,410 --> 00:03:00,110 at KSC to the dynamic test configuration 60 00:03:05,080 --> 00:03:02,420 and was shipped on October 29th to 61 00:03:07,570 --> 00:03:05,090 Marshall after dynamic testing it will 62 00:03:11,920 --> 00:03:07,580 later be returned to KSC for a pad be 63 00:03:14,050 --> 00:03:11,930 checkout the first stage directed 64 00:03:16,180 --> 00:03:14,060 October 21st will be shipped to 65 00:03:18,460 --> 00:03:16,190 Marshalls Michoud assembly facility at 66 00:03:22,960 --> 00:03:18,470 New Orleans for storage until needed at 67 00:03:25,000 --> 00:03:22,970 pad B next summer at the Marshall Center 68 00:03:26,980 --> 00:03:25,010 the second stage of the facility's 69 00:03:30,130 --> 00:03:26,990 checkout vehicle arrived on November 70 00:03:34,330 --> 00:03:30,140 10th from KSC for further use as part of 71 00:03:36,190 --> 00:03:34,340 the dynamic test vehicle after receiving 72 00:03:38,050 --> 00:03:36,200 inspection the second stage was 73 00:03:40,930 --> 00:03:38,060 transferred to Marshalls test laboratory 74 00:03:41,920 --> 00:03:40,940 for installation in the saturn v dynamic 75 00:03:44,020 --> 00:03:41,930 test stand 76 00:03:48,430 --> 00:03:44,030 the stage was stacked atop the first 77 00:03:50,560 --> 00:03:48,440 stage on November 23rd the third stage 78 00:03:52,540 --> 00:03:50,570 was installed on November 30th the 79 00:03:54,460 --> 00:03:52,550 remaining units including the instrument 80 00:03:56,830 --> 00:03:54,470 unit the spacecraft adapter and the 81 00:03:58,600 --> 00:03:56,840 Apollo spacecraft are scheduled to be 82 00:04:01,330 --> 00:03:58,610 stacked in December to complete the 83 00:04:03,610 --> 00:04:01,340 dynamic test vehicle configuration one 84 00:04:05,680 --> 00:04:03,620 or full vehicle testing to determine 85 00:04:07,930 --> 00:04:05,690 bending and vibration characteristics 86 00:04:10,320 --> 00:04:07,940 the vehicle will be subjected to in 87 00:04:12,820 --> 00:04:10,330 flight is scheduled to start in January 88 00:04:16,270 --> 00:04:12,830 test completion is expected by late 89 00:04:18,550 --> 00:04:16,280 February later for configuration to 90 00:04:20,380 --> 00:04:18,560 testing the first stage will be removed 91 00:04:22,360 --> 00:04:20,390 from the stand and the remainder of the 92 00:04:24,670 --> 00:04:22,370 vehicle will be tested to determine its 93 00:04:32,300 --> 00:04:24,680 behavior in flight after first stage 94 00:04:36,839 --> 00:04:34,860 host firing checkout of the second 95 00:04:39,089 --> 00:04:36,849 flight stage which was static tested at 96 00:04:41,309 --> 00:04:39,099 Marshall last quarter continued during 97 00:04:43,050 --> 00:04:41,319 this report period completion of 98 00:04:46,399 --> 00:04:43,060 checkout and shipment to the Kennedy 99 00:04:49,649 --> 00:04:46,409 Space Center are scheduled in January 100 00:04:52,290 --> 00:04:49,659 the third flight stage arrived at MSFC 101 00:04:54,420 --> 00:04:52,300 on October 1st from Michou where it had 102 00:04:56,640 --> 00:04:54,430 undergone post manufacturing checkout 103 00:05:00,600 --> 00:04:56,650 last quarter by the contractor the 104 00:05:02,820 --> 00:05:00,610 Boeing Company the stage was installed 105 00:05:05,580 --> 00:05:02,830 in Marshall static test and on October 106 00:05:07,980 --> 00:05:05,590 3rd for acceptance firing during routine 107 00:05:10,260 --> 00:05:07,990 maintenance a portion of a small hole 108 00:05:13,019 --> 00:05:10,270 ring was lost in the turbopump of the 109 00:05:14,820 --> 00:05:13,029 Center f1 engine when efforts to remove 110 00:05:17,279 --> 00:05:14,830 it by flushing and mechanical means 111 00:05:26,969 --> 00:05:17,289 failed the engine was removed and 112 00:05:29,100 --> 00:05:26,979 replaced by a spare the third flight 113 00:05:32,040 --> 00:05:29,110 stage was successfully static fired on 114 00:05:34,920 --> 00:05:32,050 November 15th for a 125 seconds duration 115 00:05:37,230 --> 00:05:34,930 the time lost during engine change out 116 00:05:39,869 --> 00:05:37,240 was recovered and the stage was shipped 117 00:05:42,179 --> 00:05:39,879 from MSFC to miss you in late November 118 00:05:44,159 --> 00:05:42,189 after refurbishment and post static 119 00:05:48,540 --> 00:05:44,169 check out the stage will be shipped to 120 00:05:50,579 --> 00:05:48,550 KSC and April post manufacturing 121 00:05:52,769 --> 00:05:50,589 checkout of the fourth flight stage was 122 00:05:57,089 --> 00:05:52,779 completed by Boeing at me shoe in late 123 00:05:59,100 --> 00:05:57,099 November vertical Assembly of the fifth 124 00:06:01,379 --> 00:05:59,110 flight stage was finished on September 125 00:06:03,149 --> 00:06:01,389 13th and the stage was moved from issues 126 00:06:05,490 --> 00:06:03,159 vertical assembly building into the 127 00:06:07,709 --> 00:06:05,500 manufacturing building for horizontal 128 00:06:12,450 --> 00:06:07,719 installation scheduled for completion in 129 00:06:14,969 --> 00:06:12,460 January the sixth flight stage has been 130 00:06:16,920 --> 00:06:14,979 moved into the VAB and is now undergoing 131 00:06:21,059 --> 00:06:16,930 vertical assembly with completion 132 00:06:23,070 --> 00:06:21,069 scheduled next quarter structural 133 00:06:25,290 --> 00:06:23,080 assembly of major components for the 134 00:06:28,889 --> 00:06:25,300 seventh and eighth flight stages is in 135 00:06:31,409 --> 00:06:28,899 progress at Michou minor assembly of 9th 136 00:06:40,610 --> 00:06:31,419 and 10th flight stage components is also 137 00:06:45,059 --> 00:06:43,439 the initial static firing of the first 138 00:06:46,890 --> 00:06:45,069 flight stage was successfully 139 00:06:49,620 --> 00:06:46,900 accomplished this quarter at Marshalls 140 00:06:52,670 --> 00:06:49,630 Mississippi test facility the firing was 141 00:06:55,140 --> 00:06:52,680 for full duration of 384 seconds 142 00:06:57,150 --> 00:06:55,150 originally scheduled for late September 143 00:06:59,370 --> 00:06:57,160 the firing had been delayed until the 144 00:07:01,740 --> 00:06:59,380 night of November 30th due to the 145 00:07:03,659 --> 00:07:01,750 modification work necessitated by cracks 146 00:07:08,610 --> 00:07:03,669 in the liquid oxygen and liquid hydrogen 147 00:07:10,439 --> 00:07:08,620 tanks the cracks were discovered when 148 00:07:12,719 --> 00:07:10,449 re-inspection of the stage was deemed 149 00:07:15,420 --> 00:07:12,729 mandatory following engineering 150 00:07:17,700 --> 00:07:15,430 evaluations of tests and inspections of 151 00:07:20,430 --> 00:07:17,710 the second and third flight stages by 152 00:07:22,350 --> 00:07:20,440 MSFC and the contractor the space and 153 00:07:24,570 --> 00:07:22,360 Information Systems Division of North 154 00:07:28,670 --> 00:07:24,580 American Aviation at its seal Beach 155 00:07:31,350 --> 00:07:28,680 California manufacturing facility 156 00:07:34,320 --> 00:07:31,360 principle problem areas were in the LH 157 00:07:36,870 --> 00:07:34,330 to feed line duct outlets the feed line 158 00:07:39,719 --> 00:07:36,880 elbows and the LH to tank stringers and 159 00:07:42,180 --> 00:07:39,729 ribbons while the cause of the cracks is 160 00:07:44,790 --> 00:07:42,190 under intensive investigation temporary 161 00:07:47,159 --> 00:07:44,800 fixes by means of routing furnishing and 162 00:07:51,390 --> 00:07:47,169 application of doublers were affected to 163 00:07:53,700 --> 00:07:51,400 minimize scheduled impact leakage 164 00:07:55,800 --> 00:07:53,710 through the aft locks bulkhead Dollar 165 00:07:58,219 --> 00:07:55,810 Welch doubler sealed presented another 166 00:08:00,749 --> 00:07:58,229 serious problem 167 00:08:02,719 --> 00:08:00,759 leakage discovered in an aluminum foil 168 00:08:05,040 --> 00:08:02,729 seal on the dollar welds doubler 169 00:08:07,260 --> 00:08:05,050 necessitated removal of the seal and 170 00:08:09,659 --> 00:08:07,270 replacing it with five coats total 171 00:08:11,850 --> 00:08:09,669 thickness 18 millimeters a velox 172 00:08:14,040 --> 00:08:11,860 compatible Dyna therm liquid sealant 173 00:08:16,050 --> 00:08:14,050 which had previously been utilized by 174 00:08:18,149 --> 00:08:16,060 Douglas Aircraft Company for a similar 175 00:08:22,379 --> 00:08:18,159 problem in the Saturn fives third stage 176 00:08:24,450 --> 00:08:22,389 the second of the two static firings 177 00:08:26,610 --> 00:08:24,460 required for acceptance of the first 178 00:08:29,520 --> 00:08:26,620 flight stage is due to be conducted in 179 00:08:31,770 --> 00:08:29,530 December the delay at Mt F in first 180 00:08:33,300 --> 00:08:31,780 flight stage static firings occasioned 181 00:08:36,089 --> 00:08:33,310 by the several problem area 182 00:08:37,829 --> 00:08:36,099 modifications will in turn impact the 183 00:08:43,170 --> 00:08:37,839 scheduled launch date for the first 184 00:08:45,120 --> 00:08:43,180 Saturn 5 flight vehicle at KSC systems 185 00:08:47,730 --> 00:08:45,130 check out of the second flight stage was 186 00:08:49,199 --> 00:08:47,740 completed by essent ID at seal beach on 187 00:08:51,210 --> 00:08:49,209 October 2nd 188 00:08:53,639 --> 00:08:51,220 the stage will be shipped to MTF for 189 00:08:55,619 --> 00:08:53,649 acceptance barring when the a to static 190 00:08:57,960 --> 00:08:55,629 test stand becomes available following 191 00:09:01,019 --> 00:08:57,970 completion of first flight stage firings 192 00:09:02,850 --> 00:09:01,029 during this time modification work will 193 00:09:05,489 --> 00:09:02,860 be accomplished which will minimize the 194 00:09:09,900 --> 00:09:05,499 amount of work transferred to MTF with 195 00:09:12,090 --> 00:09:09,910 the stage during systems installation on 196 00:09:14,639 --> 00:09:12,100 the third flight stage on November 29th 197 00:09:16,980 --> 00:09:14,649 the inert liquid hydrogen bulkhead was 198 00:09:19,410 --> 00:09:16,990 damaged as workmen were removing a work 199 00:09:21,150 --> 00:09:19,420 ladder from the interior due to a 200 00:09:24,090 --> 00:09:21,160 failure of a weld in the latter 201 00:09:26,429 --> 00:09:24,100 retracting mechanism a 10 foot section 202 00:09:28,530 --> 00:09:26,439 of ladder dropped striking the bulkhead 203 00:09:32,009 --> 00:09:28,540 and causing cracks in three separate 204 00:09:34,439 --> 00:09:32,019 areas the cracks measured 810 and 52 205 00:09:37,139 --> 00:09:34,449 inches in length action is now being 206 00:09:38,850 --> 00:09:37,149 planned to correct the problem impact on 207 00:09:43,829 --> 00:09:38,860 the scheduled for delivery of the stage 208 00:09:45,929 --> 00:09:43,839 2 MTF is undetermined the fourth flight 209 00:09:48,030 --> 00:09:45,939 stage is undergoing vertical assembly 210 00:09:50,910 --> 00:09:48,040 operations scheduled for completion in 211 00:09:52,799 --> 00:09:50,920 early December systems installation and 212 00:09:55,139 --> 00:09:52,809 check-out are scheduled to be completed 213 00:10:00,239 --> 00:09:55,149 and the stage delivered to MTF in the 214 00:10:02,340 --> 00:10:00,249 second quarter of 1967 fabrication and 215 00:10:04,230 --> 00:10:02,350 sub assembly of structural components 216 00:10:06,509 --> 00:10:04,240 for the fifth flight stage were finished 217 00:10:08,759 --> 00:10:06,519 this quarter and vertical assembly got 218 00:10:17,160 --> 00:10:08,769 underway completion is scheduled the 219 00:10:22,259 --> 00:10:19,530 post-fire checkout of the second flight 220 00:10:24,090 --> 00:10:22,269 stage which began last quarter continued 221 00:10:26,129 --> 00:10:24,100 during this report period and Douglas 222 00:10:28,650 --> 00:10:26,139 Aircraft Company Sacramento California 223 00:10:31,049 --> 00:10:28,660 test site completion of checkout 224 00:10:33,059 --> 00:10:31,059 modification work and shipment of the 225 00:10:37,139 --> 00:10:33,069 stage to the Kennedy Space Center are 226 00:10:39,359 --> 00:10:37,149 scheduled for next quarter the third 227 00:10:42,780 --> 00:10:39,369 flight stage was installed in sac DOS 228 00:10:44,639 --> 00:10:42,790 beta three stand on October 13th and pre 229 00:10:46,499 --> 00:10:44,649 firing checkout is underway in 230 00:10:49,199 --> 00:10:46,509 preparation for acceptance testing 231 00:10:50,699 --> 00:10:49,209 scheduled for early January factory 232 00:10:52,710 --> 00:10:50,709 check out of the stage had been 233 00:10:54,150 --> 00:10:52,720 completed in early September at 234 00:10:59,099 --> 00:10:54,160 Douglass's huntington beach california 235 00:11:01,049 --> 00:10:59,109 of manufacturing facility factory check 236 00:11:03,119 --> 00:11:01,059 out of the fourth flight stage was 237 00:11:05,249 --> 00:11:03,129 started in early October at Huntington 238 00:11:09,179 --> 00:11:05,259 Beach with completion and shipment to 239 00:11:11,069 --> 00:11:09,189 sacto due next quarter structural 240 00:11:13,470 --> 00:11:11,079 fabrication and assembly of the fifth 241 00:11:15,840 --> 00:11:13,480 and sixth flight stages are underway at 242 00:11:19,710 --> 00:11:15,850 Huntington Beach and a DA sees Santa 243 00:11:22,019 --> 00:11:19,720 Monica plant a series of hydrostatic 244 00:11:24,389 --> 00:11:22,029 test was conducted this quarter in order 245 00:11:26,340 --> 00:11:24,399 to prove the structural integrity of a 246 00:11:28,859 --> 00:11:26,350 main propellant tank assembly under 247 00:11:31,859 --> 00:11:28,869 simulated design ultimate load and 248 00:11:35,220 --> 00:11:31,869 pressurization conditions on September 249 00:11:37,109 --> 00:11:35,230 21st the lh2 tank successfully completed 250 00:11:41,009 --> 00:11:37,119 testing to the design ultimate pressure 251 00:11:42,900 --> 00:11:41,019 of 140 percent the LOX tank seal weld 252 00:11:45,059 --> 00:11:42,910 area had previously been tested 253 00:11:47,549 --> 00:11:45,069 successfully to the design ultimate 254 00:11:49,590 --> 00:11:47,559 pressure five days later in order to 255 00:11:51,749 --> 00:11:49,600 determine LH to tank ultimate 256 00:11:54,600 --> 00:11:51,759 capabilities it was hydrostatically 257 00:11:56,309 --> 00:11:54,610 tested to destruction preliminary data 258 00:11:58,559 --> 00:11:56,319 indicated that the margin of safety 259 00:12:02,189 --> 00:11:58,569 obtained for ultimate design pressures 260 00:12:10,400 --> 00:12:02,199 will be between 2% and 21 percent above 261 00:12:15,960 --> 00:12:13,200 the qual to test series for the f1 262 00:12:18,150 --> 00:12:15,970 engine which began August 1st was 263 00:12:20,280 --> 00:12:18,160 completed on September 6th at the rocket 264 00:12:23,820 --> 00:12:20,290 engine test site at Edwards California 265 00:12:25,860 --> 00:12:23,830 the f1 contractor Rocketdyne finished 266 00:12:27,480 --> 00:12:25,870 the qualification test program four 267 00:12:30,600 --> 00:12:27,490 months ahead of schedule under an 268 00:12:33,420 --> 00:12:30,610 incentivized contract one engine used 269 00:12:36,870 --> 00:12:33,430 for safety limits testing was fired 18 270 00:12:39,690 --> 00:12:36,880 times for a total of 1275 seconds 271 00:12:43,590 --> 00:12:39,700 another engine used for duration testing 272 00:12:46,470 --> 00:12:43,600 reached 2250 six seconds firing time in 273 00:12:48,720 --> 00:12:46,480 twenty tests all tests were completed 274 00:12:52,460 --> 00:12:48,730 with only minor discrepancies which will 275 00:12:55,230 --> 00:12:52,470 be resolved without scheduled impact a 276 00:12:57,990 --> 00:12:55,240 teardown inspection of the qual to test 277 00:13:00,450 --> 00:12:58,000 engines was held in November 28 at rocky 278 00:13:04,980 --> 00:13:00,460 tines Canoga Park California plant and 279 00:13:06,990 --> 00:13:04,990 results are being evaluated during the 280 00:13:09,390 --> 00:13:07,000 quarter Rocketdyne was awarded a 281 00:13:11,940 --> 00:13:09,400 contract to supply the f1 engines for 282 00:13:14,730 --> 00:13:11,950 saturn v flight vehicles 11 through 15 283 00:13:23,369 --> 00:13:14,740 and for the production support necessary 284 00:13:28,769 --> 00:13:25,679 a teardown inspection of rocky Dynes 285 00:13:31,559 --> 00:13:28,779 operated 230 thousand pound thrust j2 286 00:13:34,319 --> 00:13:31,569 engine was held in early October at the 287 00:13:36,569 --> 00:13:34,329 contractors Canoga Park plant following 288 00:13:39,479 --> 00:13:36,579 completion of the quad 2 qualification 289 00:13:41,909 --> 00:13:39,489 test firing series during the series of 290 00:13:44,519 --> 00:13:41,919 30 tests which began in early August at 291 00:13:47,460 --> 00:13:44,529 the santa susana test site slightly more 292 00:13:50,399 --> 00:13:47,470 than 3800 seconds of firing time were 293 00:13:51,899 --> 00:13:50,409 accumulated data evaluation showed the 294 00:13:56,210 --> 00:13:51,909 test series to be one of the most 295 00:13:58,979 --> 00:13:56,220 successful ever conducted by rocky dive 296 00:14:01,289 --> 00:13:58,989 rocket Dynes j2 engine component 297 00:14:04,289 --> 00:14:01,299 qualification test program which began 298 00:14:06,599 --> 00:14:04,299 in April 1965 neared completion this 299 00:14:09,119 --> 00:14:06,609 quarter in this electrical control 300 00:14:12,419 --> 00:14:09,129 assembly test helium is sprayed around 301 00:14:14,279 --> 00:14:12,429 the seals a vacuum is then drawn and any 302 00:14:18,749 --> 00:14:14,289 helium that enters the component is 303 00:14:20,609 --> 00:14:18,759 measured and recorded at the Air Force's 304 00:14:23,009 --> 00:14:20,619 Arnold engineering Development Center in 305 00:14:25,439 --> 00:14:23,019 Tullahoma Tennessee the series of j2 306 00:14:27,119 --> 00:14:25,449 engine environmental verification test 307 00:14:29,699 --> 00:14:27,129 firings which started in August 308 00:14:32,279 --> 00:14:29,709 continued this quarter with a total of 309 00:14:36,539 --> 00:14:32,289 nine firings including to start to 310 00:14:38,699 --> 00:14:36,549 restart tests during November the huge 311 00:14:41,399 --> 00:14:38,709 test cell shown in this cutaway drawing 312 00:14:43,679 --> 00:14:41,409 has the engine mounted 81 feet above 313 00:14:46,309 --> 00:14:43,689 ground with its exhaust blasting into a 314 00:14:51,090 --> 00:14:46,319 cooling chamber 100 feet in diameter and 315 00:14:54,090 --> 00:14:51,100 250 feet below ground level altitude and 316 00:15:02,090 --> 00:14:54,100 thermal conditions of 110,000 feet can 317 00:15:06,930 --> 00:15:05,040 ground testing of seven five instrument 318 00:15:08,970 --> 00:15:06,940 units was virtually concluded with 319 00:15:11,340 --> 00:15:08,980 successful completion this quarter of 320 00:15:14,670 --> 00:15:11,350 testing on the third structural test I 321 00:15:17,220 --> 00:15:14,680 you at the Marshall Center plans are to 322 00:15:20,670 --> 00:15:17,230 use this unit next to validate redesign 323 00:15:24,810 --> 00:15:20,680 of the IU's st 124 inertial platform 324 00:15:26,400 --> 00:15:24,820 mount work on saturn v flight IU's 325 00:15:28,019 --> 00:15:26,410 continued during the quarter by the 326 00:15:30,390 --> 00:15:28,029 contractor International Business 327 00:15:32,400 --> 00:15:30,400 Machines at its plentiful Alabama 328 00:15:35,340 --> 00:15:32,410 facility with checkout of the second 329 00:15:37,500 --> 00:15:35,350 flight unit completed November 4th after 330 00:15:39,390 --> 00:15:37,510 modification the unit will be stored 331 00:15:43,890 --> 00:15:39,400 until it's scheduled shipment to Kennedy 332 00:15:45,600 --> 00:15:43,900 Space Center in January the third flight 333 00:15:48,390 --> 00:15:45,610 IU underwent component assembly 334 00:15:50,640 --> 00:15:48,400 operations at IBM Huntsville throughout 335 00:15:54,750 --> 00:15:50,650 the report period with check-out slated 336 00:15:56,460 --> 00:15:54,760 to begin in mid-december structural 337 00:15:59,430 --> 00:15:56,470 fabrication on the fourth flight I you 338 00:16:07,590 --> 00:15:59,440 got underway September 19th completion 339 00:16:09,920 --> 00:16:07,600 is scheduled in late January at 340 00:16:12,329 --> 00:16:09,930 Marshalls Mississippi test facility 341 00:16:14,490 --> 00:16:12,339 activity on the dual position first 342 00:16:16,790 --> 00:16:14,500 stage static test and has begun to 343 00:16:19,980 --> 00:16:16,800 change from construction to activation 344 00:16:22,470 --> 00:16:19,990 major construction of the b2 position is 345 00:16:24,630 --> 00:16:22,480 nearing completion and activation is 346 00:16:26,970 --> 00:16:24,640 phasing in rapidly in preparation for 347 00:16:31,040 --> 00:16:26,980 installation of the all systems ground 348 00:16:34,350 --> 00:16:31,050 test stage scheduled for late December 349 00:16:36,840 --> 00:16:34,360 in October a test fixture called a 350 00:16:39,270 --> 00:16:36,850 spider was installed in the stand to 351 00:16:41,910 --> 00:16:39,280 verify capability of the four hold down 352 00:16:44,400 --> 00:16:41,920 arms with application of pressure two 353 00:16:46,740 --> 00:16:44,410 hydraulic jacks the spider simulated 354 00:16:49,410 --> 00:16:46,750 various types of loads including full 355 00:16:51,630 --> 00:16:49,420 stage thrust engine gimbal and stage 356 00:16:56,160 --> 00:16:51,640 dead weight which will be imparted to 357 00:16:58,019 --> 00:16:56,170 the hold-down arms and load frame also 358 00:17:00,240 --> 00:16:58,029 in October the main derrick was 359 00:17:02,610 --> 00:17:00,250 installed atop the stands center pier 360 00:17:04,949 --> 00:17:02,620 this Derrick will be used to install 361 00:17:07,500 --> 00:17:04,959 Saturn five first stages in the stand 362 00:17:10,620 --> 00:17:07,510 the derrick was successfully load tested 363 00:17:13,440 --> 00:17:10,630 with weights of 400,000 pounds 50 tons 364 00:17:16,960 --> 00:17:13,450 in excess of design requirements 365 00:17:19,060 --> 00:17:16,970 on October 23rd the all system's ground 366 00:17:20,800 --> 00:17:19,070 test stage arrived at MTF from the 367 00:17:23,350 --> 00:17:20,810 Marshall Center where it had undergone 368 00:17:25,330 --> 00:17:23,360 extensive testing the stage will be 369 00:17:27,670 --> 00:17:25,340 installed in the b2 position of the duo 370 00:17:29,950 --> 00:17:27,680 test and for use in checkout and 371 00:17:33,730 --> 00:17:29,960 verification of the stand Technical 372 00:17:34,540 --> 00:17:33,740 Systems and ground support equipment at 373 00:17:36,550 --> 00:17:34,550 MTF 374 00:17:38,950 --> 00:17:36,560 second stage test and number two 375 00:17:41,440 --> 00:17:38,960 designated a1 brick-and-mortar 376 00:17:43,840 --> 00:17:41,450 construction is over 90 percent complete 377 00:17:46,030 --> 00:17:43,850 the flame deflector has been installed 378 00:17:48,640 --> 00:17:46,040 and the high pressure industrial water 379 00:17:50,830 --> 00:17:48,650 piping has been laid steel work on the 380 00:17:53,530 --> 00:17:50,840 engine removal and engine access levels 381 00:17:55,690 --> 00:17:53,540 is finished the auxiliary derrick is in 382 00:17:59,830 --> 00:17:55,700 operation and work on the main derrick 383 00:18:01,600 --> 00:17:59,840 is underway the second stage vehicle 384 00:18:04,720 --> 00:18:01,610 checkout building was accepted for 385 00:18:06,670 --> 00:18:04,730 beneficial occupancy September 27th the 386 00:18:09,250 --> 00:18:06,680 second stage now undergoing static 387 00:18:11,110 --> 00:18:09,260 testing at MTF will be refurbished in 388 00:18:15,070 --> 00:18:11,120 this building prior to shipment to the 389 00:18:17,470 --> 00:18:15,080 Kennedy Space Center final beneficial 390 00:18:19,290 --> 00:18:17,480 occupancy of MTFs component Services 391 00:18:21,700 --> 00:18:19,300 Building is view in mid-december 392 00:18:23,860 --> 00:18:21,710 technical systems installation is in 393 00:18:26,790 --> 00:18:23,870 progress with completion due in early 394 00:18:31,660 --> 00:18:30,070 in summary despite delays occasion to 395 00:18:34,840 --> 00:18:31,670 this quarter due to the necessity for 396 00:18:38,200 --> 00:18:34,850 second stage modifications September 397 00:18:40,510 --> 00:18:38,210 October and November 1966 marked the 398 00:18:42,730 --> 00:18:40,520 accomplishment of major milestones in 399 00:18:44,890 --> 00:18:42,740 the Saturn 5 program with the first 400 00:18:48,370 --> 00:18:44,900 static firing of the initial second 401 00:18:51,520 --> 00:18:48,380 stage flight stage partial erection of 402 00:18:53,230 --> 00:18:51,530 the first flight vehicle completion of 403 00:18:55,540 --> 00:18:53,240 the facilities checkout vehicle's 404 00:18:59,530 --> 00:18:55,550 mission in checkout of launch complex 39 405 00:19:01,630 --> 00:18:59,540 spared a stacking of the dynamic test 406 00:19:05,110 --> 00:19:01,640 vehicle in preparation for the upcoming 407 00:19:07,210 --> 00:19:05,120 dynamic test program and continuing 408 00:19:09,940 --> 00:19:07,220 progress in the manufacture and ground 409 00:19:10,970 --> 00:19:09,950 testing of subsequent Saturn 5 flight